The heat in Buildings 1N and 2N was restored last week and will remain available.
The heating system in Building 1P has failed. The heat to 1P will now be provided via a temporary source located on the north side of 1P adjacent to the loading dock. There will be excavating equipment that will begin work in the loading dock area this week. This work is necessary to locate and repair the failed section of the heating system serving 1P. The work will continue until the repair is completed.
If you have any questions please call our office at 718.982.3210, Monday through Friday between 8:00am and 5:00pm.