Please be advised that replacement of the main entrance doors on buildings 1A and 2A will begin on or about Monday, Nov. 17. This phase of work includes:

•              Replacement of the first-floor doors facing the Great Lawn (Building 1A north side and Building 2A south side)

•              Replacement of windows in the second-floor lounges

These areas will be closed during construction, which is expected to last approximately three months.

Access Information:

•              Individuals wishing to enter from the Great Lawn should use the side entrances or the entrances facing the parking lots.

•              Please note: Side entrances are not wheelchair accessible. For accessible entry, use the parking lot entrances.

If you have any questions regarding this work, please contact the Campus Planning Office at 718.982.3214.

By the Campus Planning Office